Delivery of DZW36-1.6-SS Reciprocating Grate Biomass Steam Boiler: Chenhong Paper Industry, Jinzhou, Hebei

Brief News Intro

From foundation construction to ignition and commissioning, a DZW36-1.6-SS reciprocating grate biomass steam boiler has been successfully delivered and put into central heating operation at Chenhong Paper Industry in Jinzhou, Hebei. While securing process steam for the mill’s paper production, it continuously supplies stable steam to surrounding industrial consumers.

Project Overview

Client: Chenhong Paper Industry, Jinzhou, Hebei
Application Scenario: Supply process steam for the in-house papermaking production line, undertake central heating, and deliver stable steam to surrounding industrial users.
Equipment: DZW36-1.6-SS Reciprocating Grate Biomass Steam Boiler, Rated Evaporation Capacity: 36 t/h, Working Pressure: 1.6 MPa

Delivery Record

Foundation Work and Boiler House Construction

Prior to the boiler arrival, the boiler house and foundation construction are completed in accordance with the equipment overall dimensions to prepare for equipment installation.

new4-6

Boiler Foundation and Steel Structure Constructed per Drawings

The Boiler is Fully Assembled at the Factory and Transported to the Site

All components of the boiler are prefabricated in the factory. After the complete unit is packaged, it is transported to the project site for hoisting.

new4-7

Boiler Main Body Components Prefabricated in Factory   

new4-8

Boiler Arrives at the Project Site

Lifting and Positioning

After the complete boiler unit arrives at the site, a crane shall be used for furnace body lifting work to hoist the main boiler unit into position.

new4-9

Boiler Body Lifting Operation

Boiler Body Setting and Auxiliary Installation

The boiler body is set in place, with the main unit, maintenance platform and steam heating pipe network auxiliaries installed simultaneously.

TGHNGYJU

Installation and Positioning of Boiler Body and Supporting Thermal System (Furnace Side) 

new4-2

Boiler and Supporting Thermal System After Positioning (Pipe Network Side) 

Fuel and Dust Removal System

The feeding system and baghouse dust collector are fully fitted, preparing for fuel supply and compliant emission.

new4-3

Feeding System and Baghouse Dust Collector 

Control System

The electric control system enables equipment operation control, running status monitoring and centralized operation to ensure stable and reliable boiler operation.

new4-4

Boiler Control System On-site 

Commissioning and Operation Training

The boiler completes hot commissioning. Operation training is provided for the operation team to ensure smooth handover and operation of the equipment.

new4-5

Positioned Boiler and Maintenance Platform 

Successful Delivery

The boiler is fully commissioned and officially put into operation. The generated steam meets the self-use demand of the paper mill and the heating requirements of surrounding industrial users. The supporting bulk material feeding system consumes agricultural and forestry wastes, with flue gas discharged in compliance with standards, achieving both economic and environmental benefits.