How is the gas consumption of a gas-fired boiler calculated?

First, the rated power of the boiler and the calorific value of the gas must be known. Use the formula: Gas consumption = Boiler rated power × Time / Gas calorific value / Boiler efficiency.

Does the boiler price include installation?

Boilers are classified as special equipment (pressure equipment), and both boiler manufacturing and installation require their respective licenses. We hold the installation qualification; however, installation follows a standard procedure and the cost varies from project to project.

  • 1.Installation material costs
  • 2.Installation labor costs
  • 3.Third-party supervision and inspection

A boiler manufacturer produces hundreds of boilers every year and cannot support a large in-house installation team. Besides, local installation teams have advantages in third-party supervision and inspection, labor, and material costs. We have partner installation teams in every region. If you are comfortable with us, we can recommend an installation team for you to cooperate with directly.

What is the delivery lead time for boilers? Can delivery be expedited?

For in-stock products, the delivery time is generally around 15 days. For products not in stock, delivery typically takes about 45 days. To ensure product quality, even when stock is available, we still perform a factory quality inspection before shipment and only dispatch the boiler once it is confirmed problem-free. In general, our production cycle is 30 working days. As boilers are special equipment, production cycle and quality always come first. We will do our best to expedite, but we cannot compromise quality for an earlier delivery. We appreciate your understanding.

What are the causes and symptoms of a centrifugal pump failing to deliver water?

BoilersThe main causes of a centrifugal pump failing to deliver water are as follows:

  1. No water at the inlet or the water level is too low.
  2. The pump casing and suction pipe were not fully filled with water before start-up.
  3. There is air in the pump, or the suction lift exceeds the pump’s allowable vacuum suction lift.
  4. The inlet strainer or foot valve is clogged, or the inlet valve core has become detached or blocked.
  5. The motor rotates in reverse, the impeller is installed backward, or the coupling has disengaged.
  6. The discharge valve is closed, the valve core has become detached, or the water has no discharge destination.

When a centrifugal pump fails to deliver water, symptoms may include abnormal or severely fluctuating motor current or discharge pressure, vaporization inside the pump casing, and overheating of the pump casing.

Why do some centrifugal pumps need to be primed with water before start-up?

When the water level at the centrifugal pump inlet is lower than the pump axis, the pump becomes filled with air and will not fill with water automatically. As a result, sufficient vacuum cannot be formed inside the pump, and the liquid cannot be drawn into the impeller center under atmospheric pressure, so the pump cannot operate. Therefore, the pump and the suction pipe must first be filled with water and all air expelled before start-up. To prevent the priming water from leaking out, a foot valve is generally installed at the suction pipe inlet.

What is the purchasing process for a gas-fired boiler?

The purchasing process for a gas-fired boiler is as follows: Consult the manufacturer → Selection and configuration → Quotation → Order placement → Production → Delivery → Installation → Commissioning → Trial operation → Formal production start-up.

I am not sure which gas-fired boiler model to choose. How should I proceed with the purchase?

To determine the gas-fired boiler model, you need to establish the boiler medium and heating output in sequence. The mediums include steam, hot water, and thermal oil boilers; these parameters should be confirmed based on your application. Our project managers are highly experienced, familiar with the production processes of various industries, and skilled in gas-fired boiler selection across industries. Based on your requirements, we can determine the boiler medium and heating output, and then specify the boiler model and auxiliary equipment configuration. Feel free to contact us to learn more about boiler selection, pricing, and parameters.

What equipment does a complete gas-fired steam boiler system include?

Gas-fired steam boilers can serve a variety of industrial production processes, supplying steam for drying, sterilization, pulping, yarn sizing, disinfection, extraction, and other processes. A complete gas-fired steam boiler system includes the boiler proper, combustion equipment, control system, energy-saving devices (economizer and condenser), water treatment equipment, chimney, flue, boiler water sampler, instruments and valves, flue ducts, steam header, and other equipment. If you are converting from coal to gas or already have auxiliary equipment, optional configurations are available.

What fuels can a biomass boiler use? How is the combustion system of a dedicated biomass boiler controlled?

Biomass boilers are environmentally friendly, with a wide variety of low-cost fuels that are easy to source. The following explains the types of biomass fuels and how the combustion system of a dedicated biomass boiler is controlled.
I. Types of biomass fuels
Biomass fuels generally consist of agricultural and forestry residues such as straw, sawdust, bagasse, and rice husk, and are distinct from fossil fuels. Biomass fuel can be stored in the boiler room for convenient and timely feeding. Under current national policies and environmental standards, direct combustion of raw biomass is classified as a high-pollution fuel, permitted only in rural household stoves and not allowed in urban areas. In practice, biomass applications mainly use densified biomass fuel (biomass pellets), which is made from agricultural and forestry waste through crushing, mixing, extrusion, and drying processes to produce a new type of clean fuel that can be burned directly. Biomass fuel has a high calorific value, generally around 3,900–4,800 kcal/kg, and after carbonization the calorific value can reach 7,000–8,000 kcal/kg. Biomass fuel is clean and hygienic, convenient to feed, reduces labor intensity, greatly improves the working environment, and lowers labor costs for enterprises.
II. Combustion system control methods for biomass boilers
Under the action of the induced draft fan, the high-temperature flue gas produced by combustion passes through convective heat exchange in the smoke tubes, enters the dust collector for purification, and is finally discharged through the chimney by the induced draft fan.

  1. Soot blowing system: The boiler is equipped with a fully automatic soot blowing device that periodically sweeps the furnace and smoke tubes to prevent ash accumulation on the tube surfaces, ensuring safe and efficient boiler operation.
  2. Flue gas and air system: The air supply system is integrated with the burner. Air is delivered by the forced draft fan through the burner into the furnace to convey fuel and support combustion.
  3. Fuel feeding system: The boiler is provided with manholes and handholes for convenient maintenance. The feeding system consists of a fuel hopper, vibratory feeder, screw feeder, and screw feed pipe. The densified fuel is transferred by belt conveyor to the hopper, and the biomass boiler then supplies the BMF fuel from the hopper to the burner via the screw feeder. To ensure continuous feeding and stable material conveying, a vibratory feeder is connected between the hopper and the screw feeder.
  4. Automatic control system: The control system uses a high-brightness, full-Chinese-display interface with a reputable PLC control system as the central control unit, and exchanges information with boiler users through a human-machine interface, enabling fully automatic operation of the BMF boiler.
  5. Combustion system: Biomass fuel first undergoes a preheating process in the burner and is then delivered into the furnace by the fan for combustion. Since the fuel has a high volatile content, when the furnace temperature reaches the volatile release temperature, the igniter can be activated under air supply conditions and the fuel ignites and burns rapidly. The burner temperature is controlled.

How do I select industrial boiler water treatment equipment? What is the auxiliary equipment configuration for a dedicated biomass steam boiler?

I. Methods for selecting industrial boiler water treatment equipment

  1. First, specify the system that requires softened water: heating / cooling make-up water / process water / steam boiler / steel and iron smelting industry / chemical and pharmaceutical industry.
  2. System water usage time: hourly water consumption / average value / peak value. Does the user require continuous water supply? If continuous supply is required, choose a single-valve dual-tank or dual-control dual-bed series; otherwise, a single-valve single-tank system can be selected.
  3. Raw water total hardness: Is the water source municipal tap water, groundwater, or surface water (river, lake, or river water)? You need to provide the raw water hardness of the region. For a given water softener model, higher water hardness means less periodic treated water volume, resulting in more frequent regeneration, which is detrimental to resin service life. To avoid this, the resin volume should be increased, meaning a larger model of water softener should be selected.
  4. Required softened water flow rate (tons/hour). This is determined by the boiler model and its nature and requirements, and is used to select a standard-model water softener.
  5. Setting of periodic treated water volume. After the softener model is determined, based on the raw water hardness and the exchange working capacity of the resin used, the theoretical periodic treated water volume (tons) can be determined.
    II. Auxiliary equipment for dedicated biomass steam boilers
    When a biomass steam boiler is used for industrial production, a full set of auxiliary equipment must be configured, including a dust collector, fuel feeding equipment, forced draft fan, induced draft fan, water pump, slag remover, grate reducer, chimney, water treatment equipment, economizer, and so on. If the user is replacing an existing boiler, some auxiliary equipment can be reused to make full use of existing assets and reduce investment.